Secondary Road Department

The Linn County Secondary Road Department maintains 1,156 miles of roads and 255 bridges. Approximately 378 miles (33 percent) of the road system is hard surfaced (asphalt, concrete or seal coat) and the remaining is rock surfaced. The secondary road system is served by construction, maintenance, and roadside crews who work to provide the best experience for all users.

What We Do

Construction

Maintenance

Local Option Sales Tax

Since 2010, the Linn County Secondary Road Department has received more than $36 million in local option sales tax revenue. These funds have accelerated Linn County’s 5-year construction program by paving 106 miles of roads (30 percent of the paved system), three bridge projects, and three culvert replacement projects. The majority (94 miles) of the paving projects were concrete overlays.

Learn more about the Local Options Sales Tax Referendum.

  1. News
  2. Calendar
  3. FAQs
  4. Quick Links
  1. Walker Road Closed for Paving Project

    The project is expected to last two months. Read on...
  2. Linn County Secondary Road Department Herbicide Applications to Begin May 22

    The herbicide application project is expected to run through mid-September. Read on...
  3. Bertram Road Realignment Project to Begin March 13

    The project is part of the Bertram Bridge relocation project and includes removing the existing road, realigning the road for the new bridge, and installing new culverts. Read on...
View All News