E Ave NW

◄ Back
January 21, 2021 9:07 AM

E Ave NW Update

A culvert and grading project on E Ave NW and Linn-Benton Road.

Facebook Twitter Email

Latest Update:

July 9, 2021 10:23 AM

The intersection of 71st Street and Linn-Benton Road is now open to traffic. Traffic must turn north as Linn-Benton Road is still closed to the south.

Garret Reddish ([email protected]

Prior Updates

View All Updates
June 16, 2021 7:59 AM

As scheduled, the culvert and gradig project will start today. The contractor will be starting at the north end of Linn-Benton Road.  The road will be closed to through traffic during construction.  All local residents are expected to maintain access during constrution.  There may be isolated times when access to your property is blocked.

If you live on the road, please remove your mailbox prior to the contractor starting. If the contractor has to remove it there is a chance it will be damaged. 

Please contact me with any questions. 

Garret Reddish ([email protected])

June 14, 2021 2:43 PM

The culvert and grading project on E Ave NW and Linn-Benton Road is scheduled to start on Wednesday June 16th.  The contractor will be starting at the north end of Linn-benton Road.  The road will be closed to through traffic during construction.  All local residents are expected to maintain access during constrution.  There may be isolated times when access to your property is blocked.

If you live on the road, please remove your mailbox prior to the contractor starting. If the contractor has to remove it there is a chance it will be damaged. 

Please contact me with any questions. 

Garret Reddish ([email protected]